Skip to main content

SYS-DDM133-01 Rollback of move in on metering point

Test IDSYS-DDM133-01
DescriptionRollback of move in on metering point 
BRS's

BRS-NO-123

BRS-NO-133

RolesDDM
Preconditions

Metering point should have metering point status E22 (active) in Elhub

Metering point should have an active grid access contract with end user

Postconditions

The contract created by BRS-NO-123 is rolled back

The previous contract has been reopened

Optional/MandatoryMandatory
Test stepsExpected Result
  1. Send BRS-NO-123 til Elhub
  • Message: RequestStartOfSupply
  • Document type: 392
Request is successfully sent

2. Receive ConfirmStartOfSupply to DDM (optional)

  • Document type: 414
ConfirmStartOfSupply is received to DDM

3. Receive NotifyStartOfSupply to DDM

  • Document type: 414
NotifyStartOfSupply is received to DDM

4. Send BRS-NO-133 to Elhub

  • Message: RequestStartOfSupply
  • Document type: E02
Request is successfully sent

5. Receive ConfirmStartOfSupply to DDM (optional)

  • Document type: E02
ConfirmStartOfSupply is received to DDM

6. Receive NotifyStartOfSupply to DDM

  • Document type: 414
NotifyStartOfSupply is received to DDM
7. Verify that DDM's system is updated correctly

The contract created by BRS-NO-123 is rolled back and the previous contract has been reopened

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.